5

7 sprints to deliver an application from scratch to production for 7 types of user roles, with different work flows. Am I wrong to get pissed when the tech lead wants to implement RBAC only at the last sprint?

Comments
  • 0
    No, it should have been at the start. The equivalent of architect designing a house and only realize at the end they need doors with locks in them.
Add Comment